WELCOME TO RIVER DAVES PLACE

And now it begins................Part 2

Toolman

Well-Known Member
Joined
Aug 19, 2014
Messages
416
Reaction score
554
Op #6
Hog out and finish bearing bore.
Drill and tap oil fill and oil level check holes.
Drill and tap bearing cap holes.
Edge break.
We're 75% thru the job. All that's missing is the pipe thread water holes. I don't have any more room in the tool changer, so I will do these on a later Op. Next we'll be kicking everything up 10* and hopefully I won't screw it up! :)
 

Toolman

Well-Known Member
Joined
Aug 19, 2014
Messages
416
Reaction score
554
OP #7

Hog and finish bearing bore,
Bearing cap bolt pattern,
Edge break,
All done at 10*

Note on 2nd pic the leftover trash because the backcase is actually a cavity and this is as far as I can go without gouging the flat surface. Upcoming Op will clean up this area.
 

Toolman

Well-Known Member
Joined
Aug 19, 2014
Messages
416
Reaction score
554
CNC edge break.
1/4 pipe water holes in.
Front case is done:)
 

Toolman

Well-Known Member
Joined
Aug 19, 2014
Messages
416
Reaction score
554
Op #9. I use a 3D kellering program to take off the leftover trash shown in previous pic. The back case is now done.
 

Toolman

Well-Known Member
Joined
Aug 19, 2014
Messages
416
Reaction score
554
Tadaaaaaa! There will be a test on this later!
 

Backlash

Well-Known Member
Joined
Jan 14, 2011
Messages
13,696
Reaction score
25,889
Those are absolutely stunning! Thank you for sharing with us!!!

Henry
 

wsuwrhr

The Masheenest
Joined
Dec 20, 2007
Messages
35,634
Reaction score
23,838
Any ideas on cost yet? Are you selling these direct, or is Casale selling them?

Fill plug looks cool too.

Brian
 

Toolman

Well-Known Member
Joined
Aug 19, 2014
Messages
416
Reaction score
554
Any ideas on cost yet? Are you selling these direct, or is Casale selling them?

Fill plug looks cool too.

Brian

These will be for sale soon. Stay tuned. Casale wanted nothing to do with them. But I gave them 1st shot at 'em.
 
Top