Who had this brilliant idea? Geez.
Dig and move some dirt for the second or third time because as we know, things change.
Form for slab, then add some brick sides and electrical. Then put dirt back up to top around the sides, we then have what's called "the vault". Dig some trenches and put in some drains.
All in "two weeks".
Ready to put spa in vault.

ImageUploadedByTapatalk1447959706.663848.jpg

ImageUploadedByTapatalk1447959749.458886.jpg

ImageUploadedByTapatalk1447959802.096702.jpg

ImageUploadedByTapatalk1447959851.538826.jpg

ImageUploadedByTapatalk1447959926.021740.jpg

ImageUploadedByTapatalk1447960013.700662.jpg

ImageUploadedByTapatalk1447960079.201113.jpg

ImageUploadedByTapatalk1447960139.000800.jpg

ImageUploadedByTapatalk1447960192.663062.jpg

ImageUploadedByTapatalk1447960232.213760.jpg
 

outboardrick

Well-Known Member
Joined
Jun 3, 2008
Messages
1,931
Reaction score
1,606
That's gonna be really nice when you get it done :thumbup::thumbup:
I'm going through some of the same shit right now :grumble:
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
How we gonna get this damn thing in back yard? And in the vault. There isn't any side access with the walls up and done now.
Gonna have to go up and over house.

That's when this game changer came into the thought process. Only access is thru the garage.

ImageUploadedByTapatalk1447961106.497944.jpg

Now the question is, how is that thing gonna get thru the back garage door?

ImageUploadedByTapatalk1447961191.043245.jpg

Damn, that's tight!
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
ImageUploadedByTapatalk1447961289.312817.jpg

ImageUploadedByTapatalk1447961311.392815.jpg

ImageUploadedByTapatalk1447961327.544028.jpg

ImageUploadedByTapatalk1447961361.089353.jpg

ImageUploadedByTapatalk1447961384.488371.jpg

ImageUploadedByTapatalk1447961398.506889.jpg

ImageUploadedByTapatalk1447961415.656884.jpg

ImageUploadedByTapatalk1447961446.022358.jpg

So, we used the forks to lift and carry up driveway and into garage.
Lowered it on a few furniture dollies and pushed to the back of garage.
Then lifted it with some webbing straps and started to drive thru back garage door. Only and inch to spare on each side and we still have to raise the boom to get spa over wall. Then the boom would be extended and we would lower it.
 

Singleton

Well-Known Member
Joined
Feb 5, 2008
Messages
18,199
Reaction score
23,609
Way too stressful. Glad to see your project getting close to completion!
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Dug out more dirt and getting ready for deck to be done.
Also doing a masonry sofa, it will hide the footings for the wall and tie in the next tier/ retaining wall.

Image1461364486.958290.jpg

Image1461364555.348713.jpg

Image1461364606.669287.jpg

Removed 6 truckloads of dirt, all had to go thru the garage using a bobcat. What a mess it made!

Image1461365071.033490.jpg

Image1461365110.036310.jpg

Image1461365137.975243.jpg

Image1461365239.805633.jpg

Image1461365309.882985.jpg
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Added a back up drain in case the primary one in the spa vault ever fails (don't want the vault to fill will water and damage spa equipment).

A hole was cut thru the poured in place concrete wall

Image1461365536.458155.jpg

Image1461365571.259052.jpg
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Another hole need for a sleeve to be put in for the spa's "Cool Zone", it works like an air conditioner for the spa and can drop the water temp to 60 degrees. The cool zone will sit out side the vault and in a corner on ground level below retaining wall.

Image1461365761.872924.jpg

Image1461365777.674410.jpg

This is what the cool zone looks like,

Image1461365874.347936.jpg
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Picked out flagstone and it was delivered with some block to begin the next retaining wall. The flagstone will be used for deck around spa and stairs leading up to and on terrace level.

Image1461366102.011899.jpg

Image1461366134.230768.jpg

Image1461366148.388334.jpg

Image1461366184.385823.jpg
 

Miss Venomous

Well-Known Member
Joined
Apr 4, 2008
Messages
172
Reaction score
44

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Time to get back on it. Things starting to take some shape.

Footings for the sofa,

Image1463983850.302051.jpg

Image1463984070.007015.jpg

Forms to begin steps

Image1463983931.237196.jpg

Image1463984093.683234.jpg

Image1463985246.985658.jpg
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
The block sofa was a thought I had to cover the footing for the wall since the deck for the cuzzi would sit lower.

Block being used to build up a sofa with armrests will provide a nice sitting area next to cuzzi.

Image1463984367.755360.jpg

Image1463984444.339957.jpg

Image1463984482.958096.jpg

Image1463984496.427537.jpg
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Flagstone will be used for the deck around cuzzi, removable pieces were cut and placed on a built up platform so the service area could be accessed. Slotted drains used around the outer edges of decking material is seen with red tape. The sofa is visible in background.

Image1463984966.258059.jpg

Image1463985086.152483.jpg
 

Heylam

Well-Known Member
Joined
May 29, 2014
Messages
2,156
Reaction score
3,232
Why didn't you bury the footing? Great recovery, will look good.
 

mjc

Retired Neighbor
Joined
Jan 3, 2008
Messages
11,808
Reaction score
8,832

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Why didn't you bury the footing? Great recovery, will look good.

The footings were buried, re exposed when we dug out to drop the spa lower. The slope, tiered lots and putting in the retaining wall along with a neighbor not wanting any of his property compromised all were factors (the amount a giant ass rocks in ground didn't help either) that made challenges.
Throw some cushions in the sofa and we might be just fine.
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Did cool zone come with spa or was it bought separatly?

Cool zone is sold separately as an option, we had to pour a slab for it to sit on this week. The install should be easy to do after the holiday weekend I think.
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Finally some flagstone getting laid out.

Image1464806618.536557.jpg

And the next wall got done.

Image1464806665.366911.jpg
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Image1465523158.723360.jpg

Image1465523192.645797.jpg

Image1465523208.505723.jpg

Image1465523230.205474.jpg

Image1465523241.810450.jpg

Made some progress this week. Get some more flagstone down and I think we will be ready for stucco.

Going to wait till fall to do the stonework.
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Any dirt coming out?

I am not sure if he will need to get more out. There are a couple piles left, however it may be needed for backfilling that second wall that just went in. I haven't forgot about you :)
 

Heylam

Well-Known Member
Joined
May 29, 2014
Messages
2,156
Reaction score
3,232
Really coming together and looking great! What are the plans for wall finish, and are you going to cap them? Any exterior lighting? Can't see risers in photos, any lights? Man you've put a lot of work and time into your back yard, you must be proud of the way it's turning out.
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Really coming together and looking great! What are the plans for wall finish, and are you going to cap them? Any exterior lighting? Can't see risers in photos, any lights? Man you've put a lot of work and time into your back yard, you must be proud of the way it's turning out.

Lots to do still! However getting to this point feels so good. Been so long in the works.
The sofa area will get a smooth "Santa Barbara" stucco as the remainder of the upper wall will get stucco for now. I plan on either having a flagstone cap on it to match the deck or later if wall gets stone face we will find a different type of cap for it.
The lower wall will get brown coated this week and stay that way until fall or winter when temps drop and we begin to do the bar and bbq area with lower deck and fireplace.
Low voltage lighting are the plan for now (some colored LED's). [emoji106]
The cool zone is gonna be installed tomorrow for the cuzzi. Just in time for the triple digit temps coming next week.
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Image1467265314.939961.jpg

Image1467265325.804871.jpg

Still working on it. Grout work, flagstone cap on walls and stucco should all be completed soon.
 

Heylam

Well-Known Member
Joined
May 29, 2014
Messages
2,156
Reaction score
3,232
Do you plan on making that your retirement home and moving back to Havasu full time?
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Do you plan on making that your retirement home and moving back to Havasu full time?

I don't think I would live in havasu full time again. however, a month here and there is not out of the question. :)
 

Joker

Well-Known Member
Joined
Dec 19, 2007
Messages
19,477
Reaction score
14,094
Looks good Cameron. Question, how much concrete have you utilized to do this project to date?
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Looks good Cameron. Question, how much concrete have you utilized to do this project to date?

Lost track. Was over 80 yards before the flagstone and two more walls went in. Gonna wait to do the lower section (fire pit and bar/bbq) until November or December. My goal is to have complete by Spring '17. Fingers crossed.
 

throttle

c ya on da lake
Joined
Oct 4, 2007
Messages
11,584
Reaction score
9,657
Next up, just over 800 sq ft of pavers from street, down side of garage and behind back garage door.
 

Joker

Well-Known Member
Joined
Dec 19, 2007
Messages
19,477
Reaction score
14,094
Looks amazing Cameron. You're taking your time and doing it the way you want it.
 