We closed on our retirement home today and met with Desert Storm Pools to finalize the back yard plans. It should be done by spring 2021.
Looks great. Our dig with desert storm starts in a couple of weeks.We closed on our retirement home today and met with Desert Storm Pools to finalize the back yard plans. It should be done by spring 2021.
View attachment 934229 View attachment 934230
Good luck, Brian's not a big fan of being on site, seems like he's taking on too many jobs to properly watch over every job site.We closed on our retirement home today and met with Desert Storm Pools to finalize the back yard plans. It should be done by spring 2021.
View attachment 934229 View attachment 934230
Just make sure you stay on top of EVERYTHING. Currently we have to move the propane tank because of red tag from fire dept.. (6" to close to pool electrical panel). Had Brian put a little more thought into where all of the equipment was going to be installed this would not have happened . But sense he completely forgot about the heat pump until two hours into the pool equipment install and I had to bring it to his attention, I guess it could have been worse. He's just not a big fan of being on site, usually just long enough to smoke a cigarette, talk on the phone and then he's gone.Damn that's not good to hear. I liked your your pool and it was a deciding factor when we chose a builder.
We started our house in January and it was completed October 21st. Very happy with the builders. They got it finished when they promised and they have been on top of the couple minor repairs we found during the move in.North point is nice we looked at the models.
it looks like the lot Sizes vary for the different sized homes. When did you buy? They said sign today move in 365 days later...
Thanks for the info. Hoping this build goes as planned.Just make sure you stay on top of EVERYTHING. Currently we have to move the propane tank because of red tag from fire dept.. (6" to close to pool electrical panel). Had Brian put a little more thought into where all of the equipment was going to be installed this would not have happened . But sense he completely forgot about the heat pump until two hours into the pool equipment install and I had to bring it to his attention, I guess it could have been worse. He's just not a big fan of being on site, usually just long enough to smoke a cigarette, talk on the phone and then he's gone.
Just make sure they run a large gas line to your fire pit. At least 3/4”. Most people get screwed with very small flames. Love the design. Speakers by the spa and fire pit are also essential
That was part of the permit process for me . Down side was the gas co would not change the meter till the inspector signed off . That lead to a 3 week wait on the gas company to change the meter after the inspection . That was about 6 weeks ago and the gas guy said i was lucky that they were down to there last 6 meters of that size . That was in nevada by the wayI would also have the gas company go up in size on the regulator at the meter. I don’t think it cost us anything when we had them do this for us. The pool heater was struggling to stay on due to the regulator being to small.
Sent from my iPhone using Tapatalk
That was part of the permit process for me . Down side was the gas co would not change the meter till the inspector signed off . That lead to a 3 week wait on the gas company to change the meter after the inspection . That was about 6 weeks ago and the gas guy said i was lucky that they were down to there last 6 meters of that size . That was in nevada by the way
What was you permit cost for pool?Some progress View attachment 984115
I dont know for sure. We put a $1k deposit down to hold our place in line and get the plans and permit.What was you permit cost for pool?
They’re about $750What was you permit cost for pool?
It all depends on what your building and the city . My friend is out thousands of dollars right now and still no permit . He is in simi valley .What was you permit cost for pool?
Forgot to put Havasu. Doing owner builder and bringing the crew out when I pull the trigger. Self performing alot of it personally.It all depends on what your building and the city . My friend is out thousands of dollars right now and still no permit . He is in simi valley .
Samething my buddy is doing and he is 4 months into the permit process . I think who you use for engineering matters along with not trying to go crazy . He is going over 6 feet deep and has a slide and bathroom . He is over 5k in engineering and permit process so far . Good luck .Forgot to put Havasu. Doing owner builder and bringing the crew out when I pull the trigger. Self performing alot of it personally.
Basic kidney shape with no more then 5' deep. Spa and baja shelf. Thanks. At least me building saves towards engineerSamething my buddy is doing and he is 4 months into the permit process . I think who you use for engineering matters along with not trying to go crazy . He is going over 6 feet deep and has a slide and bathroom . He is over 5k in engineering and permit process so far . Good luck .
$576What was you permit cost for pool?
Started the travertine yesterday. View attachment 995272
Knife edge, the spa spills over into those cracks and goes back into the pool, like and infinity edge around the spa, we were going to to the entire pool that way but it was $20,000 more so we did the spa onlyWhat do they call the channel Treatment around the spa and sidewalk?
Knife edge, the spa spills over into those cracks and goes back into the pool, like and infinity edge around the spa, we were going to to the entire pool that way but it was $20,000 more so we did the spa only