Finally got a call from the hospital. Tomm 5 am check in at Havasu for the old open heart.
New arortic valve and redo a vein that is swelling. Stuck there for about 5 nights, please post some good stuff!!
Dr last week said i have a bad valve in the ticker. Going for some test on sat and tuesday. They are going to put a TAVR valve in, through the groin, 1 night stay in hospital. Any body have some advice or history on this??
New 40 x 40 slab poured, about a month of drying time. Was thinking, should i seal the slab before the building goes up? Dont want an epoxy floor, just easier cleanup of spills and such. Still looking for a crew to put it up, but building not here yet.
Looking for a company to put up my 40 x 40 metal barn in Parker. It's not red iron, galvi frame. Slab should be done in 2 weeks. We are tile guy number 3, for the tiny home, hope this works out. Just getting anything done here is crazy!!
Need to find someone that can bullnose some tile. 12 by 24 porclein, need to end up with 6 pcs 5 by 24 with the 24 side bullnosed both sides. Parker/Havasu. Pete
Looking for someone to do a 40x40 pad for my shop in Parker. Above the Sandbar on Beacon. Not a red iron building, so the footings are not crazy big. Pete
In Parker, need to fast track a 40 x 40 metal building. Variance forms going in, concrete guys are not too far booked, they just want the engineered plans. Any places that you have good past work to go to?? Need the building delivered and put up asap. Need to sell that Cali house before the...
Anyone have a land line through suddenlink? At our place in Parker above the Sandbar (bar) the verizon cell service is shit. Does not work at all, and getting ahold of the mrs is impossible.