C-2
Well-Known Member
- Joined
- Sep 26, 2007
- Messages
- 12,131
- Reaction score
- 7,540
Hey Guys:
We are adding water service to our vacant land. The City (Riverside) says no development plans required; pay us $15,000 and we'll put a meter in. They already determined a 1" line is required.
Is it that simple, or am I missing something?
Also, we do not have a "structure" per se, only a horse barn. However, later we may explore the idea of building a house on the lot. In the meantime, I am planning on running PVC piping down to the barn to run a few spigots.
Is there anything else I should know, or do I simply connect the PVC to the water meter line?
What about water pressure, should I drop some type of regulator in the line?
I have not yet started the process, but will pull the trigger within the next week or two.
We are adding water service to our vacant land. The City (Riverside) says no development plans required; pay us $15,000 and we'll put a meter in. They already determined a 1" line is required.
Is it that simple, or am I missing something?
Also, we do not have a "structure" per se, only a horse barn. However, later we may explore the idea of building a house on the lot. In the meantime, I am planning on running PVC piping down to the barn to run a few spigots.
Is there anything else I should know, or do I simply connect the PVC to the water meter line?
What about water pressure, should I drop some type of regulator in the line?
I have not yet started the process, but will pull the trigger within the next week or two.