cofooter
Well-Known Member
- Joined
- Apr 30, 2012
- Messages
- 5,613
- Reaction score
- 8,982
From FB - docks going in
That’s the Havasu Riviera, the subject of this thread.What is the development going on close to the south end of Thompson bay. Looks like a launch ramp is almost complete. Trying to get my bearings on which development is which.
Always the optimist.Only 4 years later than scheduled. Right on time!
Robby must have added construction to his Speed portfolioOnly 4 years later than scheduled. Right on time!
Robby must have added construction to his Speed portfolio
I don’t believe the forms were set before Robby started designing his car, plus the launch ramp has been paved for a while nowSad thing is Speed will have designed an entire SXS from scratch and had it mass produced in less time than it too Havasu to pave a bote ramp
I don’t believe the forms were set before Robby started designing his car, plus the launch ramp has been paved for a while now
Paved is pavedYea it has been a ramp to nowhere for 3 years now
Paved is paved
We were only talking about the ramp I understand everything is behind schedule, it must be something in the water with Havasu. I feel bad for anyone who purchases a lot and a Speed UTV.It was a dirt lot until earlier this year. It was not paved, nor was it open to the public. The cement ramp was there, that was it and technically that was a pour. They said the facility would be open 4 years ago.
We were promised rack storage for 300 boats by now.
We were only talking about the ramp I understand everything is behind schedule, it must be something in the water with Havasu. I feel bad for anyone who purchases a lot and a Speed UTV.
The ramp was paved (poured) before Robby delivered a car, which you stated it wasn’t.A ramp does not exist without access to it.
Why do you feel bad? They have both gone up in price 30% at least.
The ramp was paved (poured) before Robby delivered a car, which you stated it wasn’t.
Also, if the cars and lots were finished on time they still would have gone up in value, maybe even more.
I am a big fan of the Rivera and of Robby and would love to own one of each some day but facts are facts.
Any updates on anything? Current builds? Docks??
Any updates on anything? Current builds? Docks??
"Wave Attenuator System" Fancy.
What’s that in English?"Wave Attenuator System" Fancy.
What’s that in English?
Gawd daaaaayum that's a big mamma jamma. You don't really get the gist of the size of the houses when looking at the architect design renderings. That thing is massive. And check that view!! Holy shit.View attachment 1027496
Well, someone’s place is making progress.
It looks like they’ve poured a lot of concrete for the parking lot at the ramp and there were workers working but I have no clue when it will be finished and usable. Sorry I forgot to take a picture.
Breakwater...What’s that in English?
A wall in the water to stop the waves from hitting rich people's boats.
And keep water from splashing onto the rack storage facility.
Drove by in the boat yesterday, lots of progress in the last month. The breakwaters are huge, there will a big protected area back in there. Hopefully they are well lit at night, they could do some serious damage if hit. Looks like it will be the premier spot to have a lake house in Havasu.
Rack storage gonna change the game!!!!
What’s the over under how soon the break wall dock becomes a tie up spot to party and hang out?
The fun police will be all over that. Is it going to be an actual dock?
Close - it’s the dozens of people on the wait list it won’t be fun for.For a dozen people, yes it will
The fun police will be all over that. Is it going to be an actual dock?
That was what I had thought when I saw them. We cruised close by and checked them out 2 weeks ago.i believe they are not solid on the top(open cross members). someone will try it, but it will cause damage to boat and body
Oh shit! Rack city bitch! Rack Rack City!!
Pad is laid out for that rack storage. RACK RACK CITY!!
@LargeOrangeFont
View attachment 1049632
LOLYou mean open transitory day use storage AKA a parking lot?
We drove around the area last weekend, lots of stuff going on.To follow up on your post, there will be at least another 10 house starts this year and there should be 50 house's under construction next year. My guess is that there will be approximately 15 - 20 completed by the end of 2022.
The main entrance security gate structure for the housing community is about halfway done.
View attachment 1047951
View attachment 1047990
With all of the coin they are getting for those lots I do not understand why they couldn't have spent the extra money (maybe one lots worth) to run the electric underground from the Boating Safety Center all the way down the highway instead of adding even more power poles/lines to the Havasu landscape for all to enjoy.
There is no way it would have cost $10M more to bury that line but I will get back to you......
It’s honestly staggering the cost between overhead and underground.
I was involved in 1 underground job as a PM for 136 homes plus a small store/office, maybe 5-6 years ago. You are exactly right. It's unreal how expensive it can get...
Turning out to be a sweet place. I was definitely a hater early on…. I wish I could afford it.
I feel like the lake will be even busier once completed. As I get older, I want less people on the lake. Not enough spots to hide out peacefully. Lol
Sent from my iPhone using Tapatalk
Turning out to be a sweet place. I was definitely a hater early on…. I wish I could afford it.
I feel like the lake will be even busier once completed. As I get older, I want less people on the lake. Not enough spots to hide out peacefully. Lol
Sent from my iPhone using Tapatalk