That's awesome! How long does it take to tape something like that off?
about 12-14 hours for the hull with 4 cupholders and 6-7 for the deck with seat shells......(ballpark)...........
Post up the rendering! To anxious
no rendering.........but it is a copy(with a few little changes) as the 28ss in previous posts(silver and blue) http://www.riverdavesplace.com/forums/showthread.php?108293-More-new-builds-from-Nordic-Boats
That's going to be one hell of a ride as well if its similar to that SS in gel scheme, excited to see the interior down the road as a deck with with silver base. :thumbsup
interior to be iridium........have done in silver before...........lots o time, and lots o materials.......it's is just too hot now anyways..........
Is this the Royal's boat?
no..............it is this one, but not sure if the deal is done or not.........
http://www.riverdavesplace.com/forums/showthread.php?116901-new-26-db