AZRiverRunner
Well-Known Member
- Joined
- Nov 11, 2015
- Messages
- 282
- Reaction score
- 277
Today is the day they are draining the River in an attempt to eradicate the Caddisfly larvae and pupae.
It takes about 10 hours for the River to flow pulse to go from Davis Dam/Laughlin to The Needles / Mohave Valley area, about 16-18 hours to flow into Havasu. So beware, the River still looks to be at normal level now, but will drop quickly today.
It takes about 10 hours for the River to flow pulse to go from Davis Dam/Laughlin to The Needles / Mohave Valley area, about 16-18 hours to flow into Havasu. So beware, the River still looks to be at normal level now, but will drop quickly today.