Making progress, but now I know why the structural steel contractor has been flaky the last three weeks. They only have the steel columns fabricated. We are pouring the RV/boat garage next week and told the steel guy if he is not done when the slab is poured he is going to have to use a crane to finish on his dime!

63761.jpeg
 

v6toy4x

Well-Known Member
Joined
Nov 8, 2019
Messages
2,566
Reaction score
4,012
Frikin' subs!!

The delay will be long forgotten once you sip that first cocktail on your pool deck as the sun goes down!
And if you need a hand with the cocktails 😉
 

RIVERBORN

Well-Known Member
Joined
Aug 23, 2020
Messages
789
Reaction score
1,579
Frikin' subs!!

The delay will be long forgotten once you sip that first cocktail on your pool deck as the sun goes down!
And if you need a hand with the cocktails 😉
Especially those damn steel guys and welders…..😂
 

Racer56

Jukebox Hero
Joined
Aug 12, 2014
Messages
2,950
Reaction score
5,978
These extended gaps between photos is really having a negative impact with my voyeurism.
It's also playing havoc with my patience. #havasutime

Structural steel contractor finally admitted they don't have everything fabricated and received a proper ass chewing.

We dry packed all of the steel columns yesterday in preparation for pouring RV/boat garage slab on Monday. Structural steel contractor is coming Wednesday to finish all of the steel. Complete Truss and engineered wood package is coming on March 17th and framing will begin immediately.

I will finally be able to post real progress pictures starting next week. Hopefully we will be almost completely framed out by Desert Storm.
 

lenmann

Well-Known Member
Joined
Apr 13, 2013
Messages
1,693
Reaction score
3,515
I keep forgetting to post up in this thread. I was in Havasu a couple of weeks ago and had the chance to check out the Riviera. The boating facilities are just amazing and truly top shelf. The wifey and I visited the sales office and got the full pitch, lots of buying opportunities of all sorts and price ranges.

I took the opportunity to walk through the parking area over to where some of the new construction was underway and low and behold, there's @Racer56 new pad (pre steel). His lot location is phenomenal and the views he will have upon completion will be breathtaking. The quality and design aesthetics of the builds in Riviera are over the top and set a new high watermark for Havasu. Way more like Newport Beach than the AZ desert.

Congrats on the progress thus far, I can only imaging the excitement and anticipation you guys must be feeling.
 

Racer56

Jukebox Hero
Joined
Aug 12, 2014
Messages
2,950
Reaction score
5,978
I keep forgetting to post up in this thread. I was in Havasu a couple of weeks ago and had the chance to check out the Riviera. The boating facilities are just amazing and truly top shelf. The wifey and I visited the sales office and got the full pitch, lots of buying opportunities of all sorts and price ranges.

I took the opportunity to walk through the parking area over to where some of the new construction was underway and low and behold, there's @Racer56 new pad (pre steel). His lot location is phenomenal and the views he will have upon completion will be breathtaking. The quality and design aesthetics of the builds in Riviera are over the top and set a new high watermark for Havasu. Way more like Newport Beach than the AZ desert.

Congrats on the progress thus far, I can only imaging the excitement and anticipation you guys must be feeling.
Thanks for the compliments and I'm glad you were able to see the vision I have.

I know of a great lot that is for sale off market if you are interested. We need more RDP'ers in the Riviera.
 
  • Like
Reactions: DWC

96CarreraEclipse

Active Member
Joined
Sep 26, 2012
Messages
42
Reaction score
36
Thanks for the compliments and I'm glad you were able to see the vision I have.

I know of a great lot that is for sale off market if you are interested. We need more RDP'ers in the Riviera.
What are lots typically going for in the Riviera?
 

lenmann

Well-Known Member
Joined
Apr 13, 2013
Messages
1,693
Reaction score
3,515

RiverDiva

"Team RDP"
Joined
Sep 18, 2007
Messages
4,174
Reaction score
5,023
What are lots typically going for in the Riviera?
I was just out there with a builder friend of mine walking some lots. I have the updated inventory lists. There are some great non lake view lots still available for just over $200k that would sustain a double RV in Flat Iron. They keep going from there depending on view and size. I also have some with plans available if you want to fast forward the process. Give me a call or shoot me a text to discuss.
Stacy
928-706-4200
 

Racer56

Jukebox Hero
Joined
Aug 12, 2014
Messages
2,950
Reaction score
5,978
Trent @rdp real estate has a listing for a great lot caddy corner in front of my house.
 
  • Like
Reactions: DWC

96CarreraEclipse

Active Member
Joined
Sep 26, 2012
Messages
42
Reaction score
36
Perfect I will call tomorrow
I was just out there with a builder friend of mine walking some lots. I have the updated inventory lists. There are some great non lake view lots still available for just over $200k that would sustain a double RV in Flat Iron. They keep going from there depending on view and size. I also have some with plans available if you want to fast forward the process. Give me a call or shoot me a text to discuss.
Stacy
928-706-4200
 

Racer56

Jukebox Hero
Joined
Aug 12, 2014
Messages
2,950
Reaction score
5,978
RV/Boat garage slab poured. Upper garage slab finished. Guest bedroom/Granny pad stem walls ready to grout. Underground utilities installed ready for inspection and backfill. Trusses and engineered lumber coming Monday.

Structural steel contractor has flaked out yet again and it's going to push back the start of framing. 🤬 Depending on when they finally show up, they will have caused at least 6 weeks of delay. I can't wait for him to submit his final invoice, as I am going to use it to wipe my ass for 60+ days. 😨

IMG-20230311-WA0000~2.jpg

IMG-20230311-WA0028.jpg
IMG-20230311-WA0029.jpg

 

Amy@Team RDP

"Team RDP"
Joined
Sep 13, 2021
Messages
374
Reaction score
899
RV/Boat garage slab poured. Upper garage slab finished. Guest bedroom/Granny pad stem walls ready to grout. Underground utilities installed ready for inspection and backfill. Trusses and engineered lumber coming Monday.

Structural steel contractor has flaked out yet again and it's going to push back the start of framing. 🤬 Depending on when they finally show up, they will have caused at least 6 weeks of delay. I can't wait for him to submit his final invoice, as I am going to use it to wipe my ass for 60+ days. 😨

View attachment 1208223
View attachment 1208224 View attachment 1208226 View attachment 1208227
View attachment 1208228
It is so hard to see your project delayed but dang look at that sunset view! It will all be worth it and more!!
 

Racer56

Jukebox Hero
Joined
Aug 12, 2014
Messages
2,950
Reaction score
5,978
Big day today! Structural steel contractor got all but three beam's erected and will be back tomorrow morning to finish. The complete floor and roof truss package including all engineered lumber beams showed up this morning on two semi's from Oregon. We also grouted the guest bedroom foundation walls. Framing starting Monday morning! Woohoo 🖐

IMG-20230313-WA0032.jpg
IMG-20230313-WA0017.jpg
IMG-20230313-WA0013.jpg
IMG-20230313-WA0008.jpg
IMG-20230313-WA0007.jpg
 

Wheeler

I'm just here to bitch about others negativity.😁
Joined
Dec 25, 2007
Messages
24,921
Reaction score
39,176
Big day today! Structural steel contractor got all but three beam's erected and will be back tomorrow morning to finish. The complete floor and roof truss package including all engineered lumber beams showed up this morning on two semi's from Oregon. We also grouted the guest bedroom foundation walls. Framing starting Monday morning! Woohoo 🖐

View attachment 1208934 View attachment 1208935 View attachment 1208936 View attachment 1208937 View attachment 1208938
Damn that looking good! 👍👍
 

Wmc

The Mayor
Joined
Dec 20, 2007
Messages
4,778
Reaction score
5,073
I might have to go down there an take a look. The project is moving
 

Ace in the Hole

Well-Known Member
Joined
Aug 15, 2020
Messages
6,342
Reaction score
15,016
@Racer56 I wondered if you were in town...seems like the last couple days driving by to the marina that they had gotten a lot done on your place.
 

Ace in the Hole

Well-Known Member
Joined
Aug 15, 2020
Messages
6,342
Reaction score
15,016
I'm actually at home working to try and pay for it. My wife and daughter are there cracking the whip! She is getting more done than if I was there!
I get that.... I checked the thread and was going to swing by tomorrow to send you pics If I didn't see an update. At least your steel guys got on the ball it seems!
 

Racer56

Jukebox Hero
Joined
Aug 12, 2014
Messages
2,950
Reaction score
5,978
I get that.... I checked the thread and was going to swing by tomorrow to send you pics If I didn't see an update. At least you steel guys got on the ball it seems!
Like I said, the steel guys learned not to bullshit my wife.🤣 I'm coming Friday to bring all of the nails and hardware, starting framing Monday morning!

Any updates from Jeremy on the lift and cover situation?
 

Ace in the Hole

Well-Known Member
Joined
Aug 15, 2020
Messages
6,342
Reaction score
15,016
Like I said, the steel guys learned not to bullshit my wife.🤣 I'm coming Friday to bring all of the nails and hardware, starting framing Monday morning!

Any updates from Jeremy on the lift and cover situation?
TBH I didn't have the bandwidth for that call today but I will tomorrow. I want to have them stick corner bumpers on my slip before I come back as well.
 

Racer56

Jukebox Hero
Joined
Aug 12, 2014
Messages
2,950
Reaction score
5,978
TBH I didn't have the bandwidth for that call today but I will tomorrow. I want to have them stick corner bumpers on my slip before I come back as well.
If you don't mind give me a call after you talk to him.

Shane 818-540-5656
 

Hammer

Well-Known Member
Joined
Apr 17, 2010
Messages
22,353
Reaction score
14,260
Congrats on getting to the framing stage! Thank you for sharing your build.
 

FROGMAN524

Well-Known Member
Joined
Mar 16, 2013
Messages
5,732
Reaction score
10,525
Apparently the trades aren’t thin in LHC like they are in Phoenix, at least that’s what my builder tells me. You’ll be in before I will probably.
 

Racer56

Jukebox Hero
Joined
Aug 12, 2014
Messages
2,950
Reaction score
5,978
Apparently the trades aren’t thin in LHC like they are in Phoenix, at least that’s what my builder tells me. You’ll be in before I will probably.
Depends on the trade. Basic trade's like plumbing, electric and HVAC are no problem in Havasu. Some trade's like structural steel are a problem, until recently there was only one contractor in town. Specialty trade's like floor leveling/lightweight concrete don't exist in Havasu and have to be brought in from one of the three major cities.
 

Bobby V

Havasu1986
Joined
Dec 20, 2007
Messages
23,769
Reaction score
13,565
Depends on the trade. Basic trade's like plumbing, electric and HVAC are no problem in Havasu. Some trade's like structural steel are a problem, until recently there was only one contractor in town. Specialty trade's like floor leveling/lightweight concrete don't exist in Havasu and have to be brought in from one of the three major cities.
Mansell Steel did the beams for my RV garage 20 years ago. Are fire sprinklers required?
 

Racer56

Jukebox Hero
Joined
Aug 12, 2014
Messages
2,950
Reaction score
5,978
RV/Boat garage, mezzanine level framing finished and all first floor trusses and sheeting done. Living level lumber arrived this morning and snapped lines today. Framer's will start standing walls tomorrow morning.

67738.jpeg
 

MeCasa16

Well-Known Member
Joined
May 29, 2018
Messages
1,671
Reaction score
3,399
Great thread. I can’t believe I haven’t found this until now. Your house is amazing. That view is absolutely incredible. Can’t wait to see it progressing.
 

v6toy4x

Well-Known Member
Joined
Nov 8, 2019
Messages
2,566
Reaction score
4,012
RV/Boat garage, mezzanine level framing finished and all first floor trusses and sheeting done. Living level lumber arrived this morning and snapped lines today. Framer's will start standing walls tomorrow morning.

View attachment 1217751
how pissed is your neighbor right about now??
 